CLITE
HERE THE CARBON IS COUNTED

Climate and ESG
compliance infrastructure

Regulators, investors and businesses depend on verified, auditable climate and ESG positions. Clite produces them, CBAM today, four more mandates in sequence.

Join the waitlist CBAM MODULE LIVE  ยท  FOUR MANDATES IN SEQUENCE
Goods crossing a carbon border, drawn in tapestry styleWorkers feed a smoking furnace at left. A ship carries metal bars across the sea. At right an official at a border gate weighs the cargo and records it on a scroll.
THE VERIFIED POSITION

Reports are not the product. The position is.

A report can be rewritten. A position has to survive a verifier, a customs authority and a buyer asking where the number came from.

Insight, not raw data

Clite is built to hold the verified position, not the supplier's plant data. Supplier-side sharing is on the roadmap.

Built for the audit

Every figure carries its input, its method and the article it rests on. The trail is retained by default.

A single base, five mandates

The same verified position answers CBAM now and is built to answer the mandates that follow, without running the data exercise twice.

THE MANDATES

Mandate coverage

CBAM is live. The remaining four sit on the same base and are released in sequence.

MANDATE
JURISDICTION
OBLIGATION
STATUS
Carbon Border Adjustment Mechanism
European Union

Embedded emissions and certificate obligation for iron and steel, cement, aluminium, fertilisers, electricity and hydrogen

LIVE
UAE Decree-Law No. 11
Reduction of Climate Change Effects
United Arab Emirates

Measure, report and reduce GHG emissions. All entities in the UAE, including free zones.

NEXT
CSDDD
Corporate Sustainability Due Diligence
European Union

Due diligence across the chain of activities of companies above 5,000 employees and EUR 1.5bn turnover. Applies from 26 July 2029.

PLANNED
ESPR
Ecodesign for Sustainable Products
European Union

Digital product passport and lifecycle sustainability documentation at product level

PLANNED
TNFD
Nature-Related Financial Disclosures
Global, voluntary

LEAP framework, nature dependency and impact assessment across the value chain

PLANNED

UK CBAM, from 1 January 2027, will be handled as a parameter set on the same module, not a separate build.

THE LIVE MODULE

CBAM

The definitive phase began in January 2026. The first declaration and certificate surrender are due by 30 September 2027, for 2026 imports. The phase-in runs to 2034. The arithmetic is not the hard part. Getting verified emissions out of a supplier who has never been asked for them is.

I

Set up the declarant

Authorised declarant, reporting year, installations of origin.

II

Load the imports

Goods, CN codes, net mass and country of origin.

III

Attach supplier data

Actual verified emissions from the installation, with its evidence.

IV

Run the obligation

Deterministic engine, twelve steps, each recorded.

V

Deduct carbon price paid

Carbon price already settled at origin, where it is evidenced.

VI

Review the position

Certificate count, phase-in factor and the basis for each figure.

VII

Export the declaration

XML for the declarant to file, with the supporting pack.

Iron and steel, aluminium, fertilisers and cement carry a 50-tonne cumulative net mass threshold per importer per calendar year. Once crossed, the full annual volume is obligated. Electricity and hydrogen sit outside it. The engine, the regulations it rests on, the operating model and the known limits are set out in full on the CBAM page.

Read the full CBAM page

TWO SIDES OF A SINGLE SHIPMENT

Who Clite is for

EU importers

You carry the obligation and the penalty, and the data you need sits in a plant you do not control.

  • Know your exposure before the declaration falls due
  • Hold supplier data per installation, per CN code, per production route
  • File on figures you can defend line by line

GCC, INDIA AND TURKEY EXPORTERS

Your buyers now need numbers you were never required to produce. Without your numbers, your buyer files on EU default values, set near the worst plant in your country. You pay for emissions you did not produce.

On the roadmap, not yet live

Once supplier onboarding ships, you will be able to:

  • Produce emissions data in the form the buyer's filing needs
  • Share the position without handing over your plant data
  • Do the work once and reuse it for every buyer who asks

Clite operates from India with reach into the GCC and Turkey.

HOW IT IS BUILT

Platform

HOSTING
AWS eu-west-1 (Ireland).
CALCULATION
Rules engine. Deterministic, reproducible, versioned.
RETENTION
Audit trail kept by default. Deleted if you opt out.
FILING
Clite produces the declaration. You submit it.
SERVICE
Technology only. Clite does not conduct site visits.
SUPPLIER ONBOARDING
On the roadmap, not yet live.
WHAT COMES NEXT

The sequence

Each mandate reuses the verified position rather than starting a fresh data exercise.

CBAM

Live. Embedded emissions, certificate obligation and declaration XML for EU importers. UK CBAM to follow as a parameter set.

UAE Decree-Law No. 11

Next. GHG emissions measurement, reporting and reduction for entities in the UAE, including free zones.

CSDDD

Planned. Due diligence across the chain of activities, drawing on supplier positions already verified for CBAM.

ESPR

Planned. Digital product passport and lifecycle documentation at product level.

TNFD

Planned. Nature dependency and impact assessment under the LEAP framework.

POSITION IS VERIFIED HERE

Join the waitlist

Tell us what you import or export and which mandate is closest.
We will come back with what Clite covers today, and what it does not.

We reply from a real address. No newsletter, no spam.